Minemax Scheduler 6.5.4

Scheduler Releases

6.5.4

Bug Fixes

  • Fixed issue with grouping separator dropdown within import configurations;
  • User option to add extra spacing to top and bottom of y-axis of line charts;

6.5.3

Enhancements

  • Per-period maximum pit group constraints;
  • Per-period maximum pit constraints;
  • Per-period maximum bench constraints;
  • Pit group precedences;
  • Upgrade to CPLEX 12.9;

Bug Fixes

  • Validation of negative pit, group, dump and total movement constraints;
  • Fixed issue with copying process ratio constraints to clipboard;
  • Fixed earliest start issue with block by block scheduling;
  • Fixed potential violation of constraints on calculated processes that contain multiple mining processes with the same movement direction;
  • Fixed issue with editing grade ranges in the Schedule Table report;
  • Multiple CAPEX expansions of the same process now correctly calculate earliest start;

Ask us a question

You can read all about our mine planning software, as well as our mining software training and consulting services, right here on our website. But if you have any questions, we’re here to help.

Stay up to date. Join our mailing list.

  • This field is for validation purposes and should be left unchanged.