Mastering the Vertical Rate of Advance

Minemax News

Minemax Scheduler v7.6 has introduced a new feature that gives you greater control over the spatial benches constraint, a vital tool for managing the vertical rate of advance or sink rate in your mining pits.

Watch this video to learn how to leverage the spatial benches constraint effectively. Our demonstration showcases the use of the bench attribute multiplier to regulate sink rates with increasing depth. This technique can also be applied to other real-world factors such as rock types, mineral distribution, bench tonnage or simulating double/triple benching.

Ask us a question

You can read all about our mine planning software, as well as our mining software training and consulting services, right here on our website. But if you have any questions, we’re here to help.

Stay up to date. Join our mailing list.

  • This field is for validation purposes and should be left unchanged.