Schedule Optimization Module
Minemax Planner's Schedule Optimization module provides mine planning engineers with a unified framework for strategic mine planning. From a set of nested pits, it is used to construct mineable pushbacks and then optimally schedules the pushbacks while satisfying mining, milling, blending and bench lag constraints. The following functionality is supported.
- Pit Optimization
- Nested Shell Generation
- Minimum Mining Width
- Pushbacks
- Create pushbacks from nested pit shells
- Load designed pushbacks
- Digitize polygon and project at angle to create pushback
- Generate reserves from each bench from block model
- Constraints
- Mining
- Milling
- Blending
- Bench Lag
- Visualize Pit Depletion in 3D